Radwag BALANCES 3Y SERIES Manuel d'utilisateur Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 246
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
- 11 -
2. UNPACKING AND INSTALLATION
2.1. Ultra-microbalaces UYA 3Y
Carefully unpack the balance, remove plastic, cardboard and foil packagings together with
protective elements and using gently movements place the balance onto its location.
Assembly the weighing pan and other elements following the diagram.
After ultra-microbalance installing at operating place, following should be set:
1 pan shield
2 bottom ring
3 balance pan
4 glass cover
After the elements setting, additional devices should be connected and balance should be
plugged to power source. Power socket is located on back side of electronic module.
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 245 246

Commentaires sur ces manuels

Pas de commentaire