Switch settings SW1:
1 – ON
2 – ON
3 – OFF
7. Connect socket SUB-D with a cable,
8. Remove the hole plug from one of the free glands and led the cable
through;
9. The cable connect to the group of wires (unhook band clips
fastening the group of wires, lay the cable and hook the band clips).
Band clips of multiple usage;
10. Screw down the back wall.
11. Set in the MS Windows Device manager, USB serial port on COM4
35. ADDITIONAL EQUIPMENT
Additional weighing platform module - Metrological parameters
as for main platform
In / out module - Additional 8 in / out
Profibus DP V1 interface - Slave working mode
- 132 -
Commentaires sur ces manuels